Phase 4 at Advanced Manufacturing Park / September, 2022

THP are working on the latest phase of the Advanced Manufacturing Park in South Yorkshire, alongside civil and structural engineers, RWO.

R-Evolution phase 4 is part of the 150-acre Advanced Manufacturing Park, which is being developed off M1 Junction 33 near Rotherham, by Harworth Group.

More than 2 million sqft of industrial space is set to be developed, generating an estimated 4,000 new manufacturing jobs, and the space is set to be designed and constructed to the highest BREAM environmental and sustainability standards.